4
Between day 21-28 - Installation completed, tested and switched off until your meter is changed
Day 28 - Electrical Works Request (EWR) application submitted by IWE and STC (Formbay)
signature required from you (see page 7)
Day 35 - Final payment to be made by you within 7 days of installation
Between Day 42-56 - Meter change over by Metering Dynamics and system is switched on
Day 58 - System handover (appointment with IWE if required)
*Please note the above timeline is a guide only and may be subject to change.
Installation process - what to expect
Upon your acceptance of the contract and payment of a 50% deposit, IWE will submit a
connection application to TasNetworks on your behalf.
Installation:
Installers usually arrive between 8-9am. Please be available at this time to go through your
installation. There will also be a form required to sign on the day for the STC rebate.
Upon completion, our installers will give you a brief run through on how your system works and
will require your WiFi network name for your modem and password (or for you to log on on
their behalf) to set up the monitoring and remote diagnosis functions.
**As per your terms and conditions, payment is required of your remaining balance
within 7 days of the I Want Energy solar installation.**
Waiting for the other guys:
The day we complete the installation we submit an electrical work request (EWR) to TasNetworks,
the second half of the meter change request . TasNetworks will pass on the EWR to your retailer,
Aurora Energy, who will then contact you seeking permission to enter your property and turn off
your power supply when the new meter is installed.
Once you have granted permission to Aurora, they will raise a work order asking a separate
company, Metering Dynamics, to install your new meter. You will then be contacted by a
Metering Dynamics representative to book an appointment. We are unable to give a lead time for